• Home

  • Blog

  • More

    Use tab to navigate through the menu items.
    Featured Posts
    Posts are coming soon
    Stay tuned...
    Recent Posts

    Publications list, June 2022

    Platinum mine tailings sampling

    Platinum mine tailings sampling

    Use of a mini block sampler in bauxite tailings

    Use of a mini block sampler in bauxite tailings

    Mini Calibration Chamber testing

    Mini Calibration Chamber testing

    Preparation of centrifuge test

    Preparation of centrifuge test

    Preparation of bulk samples

    Preparation of bulk samples

    Centrifuge testing of iron ore tailings

    Centrifuge testing of iron ore tailings

    Use of DEM to simulate CPT

    Use of DEM to simulate CPT

    Tube samples to supplement calibration chamber works

    Tube samples to supplement calibration chamber works

    Slope stability round robin

    Slope stability round robin

    Archive
    • June 2022 (1) 1 post
    • June 2021 (1) 1 post
    • May 2021 (1) 1 post
    • July 2020 (1) 1 post
    • May 2020 (2) 2 posts
    • February 2020 (3) 3 posts
    • October 2019 (1) 1 post
    • April 2019 (1) 1 post
    • March 2019 (2) 2 posts
    • November 2018 (1) 1 post
    • September 2018 (1) 1 post
    • July 2018 (1) 1 post
    • May 2018 (1) 1 post
    • April 2018 (2) 2 posts
    Search By Tags
    No tags yet.
    Follow Us
    • Facebook Basic Square
    • Twitter Basic Square
    • Google+ Basic Square
    Calibration chamber tests underway at UNSW

    Calibration chamber tests underway at UNSW

    Calibration chamber tests have started at UNSW on our first tailings sample, with tests being carried out on both saturated and unsaturated material. Photographs of sample preparation and test setup are below. These results will assist in refining state parameter interpretation methods and in accounting for the effect of unsaturated conditions on CPTu results in tailings.

    -