• Home

  • Blog

  • More

    Use tab to navigate through the menu items.
    Featured Posts
    Posts are coming soon
    Stay tuned...
    Recent Posts

    Publications list, June 2022

    Platinum mine tailings sampling

    Platinum mine tailings sampling

    Use of a mini block sampler in bauxite tailings

    Use of a mini block sampler in bauxite tailings

    Mini Calibration Chamber testing

    Mini Calibration Chamber testing

    Preparation of centrifuge test

    Preparation of centrifuge test

    Preparation of bulk samples

    Preparation of bulk samples

    Centrifuge testing of iron ore tailings

    Centrifuge testing of iron ore tailings

    Use of DEM to simulate CPT

    Use of DEM to simulate CPT

    Tube samples to supplement calibration chamber works

    Tube samples to supplement calibration chamber works

    Slope stability round robin

    Slope stability round robin

    Archive
    • June 2022 (1) 1 post
    • June 2021 (1) 1 post
    • May 2021 (1) 1 post
    • July 2020 (1) 1 post
    • May 2020 (2) 2 posts
    • February 2020 (3) 3 posts
    • October 2019 (1) 1 post
    • April 2019 (1) 1 post
    • March 2019 (2) 2 posts
    • November 2018 (1) 1 post
    • September 2018 (1) 1 post
    • July 2018 (1) 1 post
    • May 2018 (1) 1 post
    • April 2018 (2) 2 posts
    Search By Tags
    No tags yet.
    Follow Us
    • Facebook Basic Square
    • Twitter Basic Square
    • Google+ Basic Square
    Mini Calibration Chamber testing

    Mini Calibration Chamber testing

    As part of the TAILLIQ project, we are testing different mine tailings on a mini calibration chamber developed at UWA through the modification of a triaxial equipment and the addition of two different small CPT probes developed by the NGCF team (http://www.ngcf.edu.au/) also at UWA. The mini calibration chamber allows the preparation of samples with diameters of 200mm and 300mm tall. Samples prepared with moist tamping and slurry deposition techniques have been penetrated at

    -